Preview of the new PS Dry Lining website · items in [brackets] are waiting for data from PS
Projects / Chester

Care home — Chester

A full dry lining and carpentry package on a care home new build — from ground-floor block walls to the roof.

Client typeHealthcare · new build
LocationChester
PackageDry lining and carpentry · timber floors and roofs
SystemsFireline, dot-and-dab, timber joists, T&G
Care home — Chester
Scope of work

What the package included

  • 12.5 mm plasterboard on dot-and-dab, 3 mm plaster coat both sides of the ground-floor block walls.
  • First-floor timber floors — 3" × 7" joists, mass-barrier ceilings (two layers of Fireline, 100 mm insulation, fire tape), T&G boarding.
  • First-floor walls — 2" × 4" timber frames, 15 mm Fireline, 3 mm plaster coat both sides.
  • Pitched and flat roofs — 15 mm Fireline, fire taping, maintenance walkways.
  • Doors, ironmongery, skirtings, shelves, MDF pelmets and staircases.
  • Outdoor walkway with pitched roof on 150 × 150 mm timber posts.
Gallery

From site

Reach out

Need a crew on site?
Contact us today

FOTO: Peter & crew on site — black & white (to be taken)
Get in touch
Area
Manchester / Chester · North West